After nearly 4 months, this one is finished.
As written earlier the tiny decals were very time consuming and the instructions of the underside were not useable.
The remove before flight tags are from Eduard (49546) and the F.O.D. covers from Q-M-T (R48002).
Paint is from Vallejo.
Thanks for looking.
Jan Remco
dinsdag 26 april 2016
vrijdag 22 april 2016
Under construction: McDonnell Douglas F-15B "Eagle" Israeli Air Force finished 23-04-2016
Finished today, for now this build is the longest build timewise. It took me 4 months to finish the F-15. Mostely due to the tiny dcals.
Later I'll take some photos with a decent camera.
Jan Remco
zondag 17 april 2016
Under construction: McDonnell Douglas F-15B "Eagle" Israeli Air Force
I don't know the idea behind the way the decals sheet was set up, but I would have prefered another set up. Not left right but on the way you place them on the aircraft (left, right, top and bottom).
The undercarriage is attached, hopefulle I get this bird done in the next view days.
Thank you for reading.
Jan Remco
Abonneren op:
Posts (Atom)